Recently we completed a  shower remodel at a home in Tumwater. The old shower, built in the early 60′s, had seen better days and needed an upgrade. The faucet and door were worn out. The original ceiling was at 6’6″ even though the rest of the bathroom had 8’0″ ceilings. Because the ceiling was low the shower head  came out of the wall at 6’0″ makeing it uncomfortable for any very tall to shower.

After demolition and some bug repairs to the framing members, we discovered we could easily lift the ceiling to the 8’0″ level. Actual we left it down just a few inches to accommodate our tile layout. We then built into a wall a soap and shampoo cubbie, that allowed large bottles of shampoo on top and still had a 6″ area for the hand soap .  we added blocking in the locations where we wanted to add Grab Bars. We moved the faucet to be near the door, so you could turn on the water without getting in, yet put the shower head on the side wall, which made the most sense with this shape of shower.

After the tile was all set and grouted, we installed the  grab bars, plumbing trim and a new shower door. The homeowners tell me they cant believe how much bigger it feels with the taller ceiling. And for the elderly mother the two grab bars offer a lot of support and ease of mind for everyone.

Leave a Reply

You must be logged in to post a comment.

Recent Posts
  • Infrared Imagery: How Cool Is That?
  • Here’s to A Great Mini-Split/Ductless Heat Pump Summer!
  • Ductless Heat Pumps: A Case Study
  • Ductless Heating and Cooling – A Proven History
  • How Do Ductless Heat Pumps, a.k.a. Mini-Splits, Work? Part One